Section outline
-
-
-
Explore the innovative solutions developed within the TANGENT project.
-
-
-
Explore and download the project deliverables below.
📄 D1.1 – Multi-actor Co-creation Strategies for Each Case Study 📄 D1.2 – NTM Needs Assessment and System Requirements📄 D1.3 – Multi-actor Cooperation Models for NTM. First Release📄 D1.4 – Policy, Regulatory and Planning Framework for TNM. First Release📄 D1.5 – Report on TANGENT Forum Activities📄 D1.6 – Multi-actor Cooperation Models for NTM. Second Release📄 D1.7 – Policy, Regulatory and Planning Framework for Network Traffic Management. Second Release📄 D2.1 – Data Requirements and Available Data Sources📄 D2.2 – Data-sharing governance model📄 D3.1 – Travel Behaviour: State-of-the-art, Current and Future Mobility Patterns📄 D3.2 – Travel Choice Modelling (Set of Models, Code). First Release📄 D3.3 – In-depth Analysis of Travel Behaviour📄 D3.4 – Travel Choice Modelling (Set of Models, Code). Second Release📄 D4.1 – Report on the Relevant State-of-the-Art Approaches for Traffic Predictions and Simulations📄 D4.4 – Report on the Detection and Impact Analysis of Traffic Events📄 D5.1 – Analysis of Current Approaches in Optimization of Transport Network Management📄 D6.3 – Smart Infrastructure Index Classification Report. First Release📄 D6.6 – Smart Infrastructure Index Report. Second Release📄 D7.3 – Assessment of the Testing Results in the Case Study of Rennes📄 D7.4 – Assessment of the Testing Results in the Case Study of Lisbon📄 D7.5 – Assessment of the Testing Results in the Case Study of Greater Manchester📄 D7.6 – Assessment of the Testing Results in the Case Study of Athens📄 D7.7 – Impact Assessment Report📄 D8.1 – Communication and Dissemination Plan📄 D8.2 – Website and Social Networks Profiles📄 D8.3 – Report on Dissemination Activities (including cooperation with other projects). First Release📄 D8.4 – Final Booklet📄 D8.5 – Policy Recommendations📄 D8.7 – Report on Dissemination Activities (including cooperation with other projects). Second Release📄 D9.1 – Project Management Handbook📄 D9.2 – Data Management Plan. First Release📄 D9.3 – IPR Management and Data Protection. First Release📄 D9.4 – Ethics Monitoring. First Release📄 D9.5 – Project Management Handbook. Second Release📄 D9.6 – Project Management Handbook. Third Release📄 D9.7 – Data Management Plan. Second Release📄 D9.8 – Data Management Plan. Third Release📄 D9.9 – IPR Management and Data Protection. Second Release📄 D9.10 – Ethics Monitoring. Second Release
-
-
-
Explore the multimedia content developed within the TANGENT project.
🎥 The TANGENT Tool: An Explainer Video
🎥 Webinar 1 – Navigating through Network and Traffic Management
🎥 Webinar 2 – Real-Time Traffic Modelling and Forecasting Tools
🎥 Webinar 3 – Transport Network Optimisation and Arbitration Models
🎥 Webinar 4 – Integrated Tool for Cooperative Traffic Management & Case Study Results
🎥 Multimodal Traffic Management Cluster – Overview
-
-
-
Explore the dissemination materials developed within the TANGENT project.
-
-